All foundations installed at the Baltic Power offshore wind farm

Baltic Power, a joint venture offshore wind project of ORLEN Group and Northland Power, completed the main installation works of all 78 key elements of foundations – monopiles for turbines and offshore substations. Over 20 vessels and 500 crew members and contractor representatives took part in this part of the installation campaign.

Installation of offshore foundations is an enormous challenge; we performed a campaign that was unpreceded in Poland in terms of scope and scale of works. Vessel crews operated precisely with heavy loads, reaching 1300-1700 tons and 100 meters in length. Therefore, multiple operations were a single-attempt work leaving no space for mistakes. Moreover, they were performed in challenging sea and weather conditions. That’s why it is such a noticeable milestone and a moment of pride for all of us – comments Maciej Stryjecki, CEO and the President of the Management Board of Baltic Power.

Read full announcement (external link)

Originally published on 18 Feb

Announcements are published as a service to readers. The sender is responsible for all content. Announcements for publication can be submitted to announcements@thehanseatic.com.

Copy Link

Viking Line continues its major investment in biogas

By Viking Line 4 February 2026

Viking Line is starting 2026 by renewing its offer of travel and transport powered by a high share of renewable European biogas. After multiplying the use of biofuel tenfold last year, the Åland-based shipping company has now secured another year at the same ambitious level.

The biogas is used alongside liquefied natural gas on the company’s newest ships, Viking Glory and Viking Grace, which operate daily between Turku and Stockholm. This combination results in very low sulphur and particle emissions, as well as a greatly reduced climate footprint.

Read full announcement (external link)

Originally published on 3 Feb

Copy Link

The best business idea at the Icebreakers’26 festival will receive €10,000

By Labs of Latvia 4 February 2026

The author of the most promising idea in the business idea competition at this year’s Icebreakers’26 business opportunity festival will receive €10,000 to support the development of their entrepreneurial venture.

Icebreakers’26 will take place at the University of Latvia’s (UL) House of Science in Torņakalns on March 5. The festival’s central theme is “Change the Rules of the Game,” accentuating the audacity to think and act differently in order to create innovations and develop entrepreneurial skills. It is a theme that encourages participants to challenge conventions, step out of their comfort zones, and seek new solutions that drive change in business, research, and society. It encourages the use of knowledge, creativity, and collaboration as a foundation for sustainable development—and participants to not merely follow trends, but actually change the rules of the game.

Read full announcement (external link)

Originally published on 4 Feb

Copy Link

Axiology Raises €5 Million Seed Round to Modernise Europe’s Capital Markets Infrastructure

By Startup Lithuania 4 February 2026

Lithuanian capital markets infrastructure provider Axiology has secured €5 million in seed funding to expand its regulated, blockchain-based platform for issuing, trading, and settling securities across Europe. The investment will support the rollout of new tokenised securities capabilities under the EU DLT Pilot Regime and accelerate the company’s go-to-market strategy.

The funding round was led by Exponential Science, e2vc, and Coinvest Capital, with participation from TIBAS Ventures and Plug and Play. Existing investors, including BSV Ventures, NGL Ventures, and others, also joined the round. To date, Axiology has raised €7 million in total.

Read full announcement (external link)

Originally published on 4 Feb

Copy Link

Slovenian company NGEN Group enters Latvia: will develop energy storage project using Tesla technologies

By Announcements 4 February 2026

At a media event hosted today by the Investment and Development Agency of Latvia, it was announced that the Slovenia‑based energy company NGEN Group is entering the Latvian market with a €50 million investment.

According to information provided by investors, a deal has been concluded whereby NGEN Group has become the 100% owner of SIA “Liepāja ESS” to implement a stand-alone grid-connected battery energy storage project with a capacity of 100 MW and a storage capacity of 200 MWh in Grobiņa parish, Dienvidkurzeme region, at the Grobiņa substation. Construction work is planned to be completed this year.

Read full announcement (external link)

Originally published on 3 Feb

Copy Link

Estonia launches Defence Business Lab for startups

By Invest in Estonia 3 February 2026

To secure the status of Europe’s frontier DefenceTech destination, Estonia is moving fast, and is now building a pipeline for defence startups to win major international funding. Estonia’s Ministry of Defence, in collaboration with the Ministry of Economic Affairs and Communications, has established a pre-accelerator programme called the Defence Business Lab, according to the official press release.

Designed to help local companies compete more effectively in major international defence funding competitions, the programme aims to prepare early-stage development teams for successful applications to NATO DIANA (Defence Innovation Accelerator for the North Atlantic) and the European Defence Fund (EDF), two significant sources of defence funding.

Read full announcement (external link)

Originally published on 2 Feb

Copy Link

Industrial metaverse and AI drive Finland’s tech leadership

By Business Finland 3 February 2026

Innovation in Finland defines the way business operates. The country fosters ecosystems where global players connect, and technology leadership spans AI, connectivity, electrification, and defense. For international investors and partners, Finland offers advanced solutions and a collaborative model that accelerates impact.

“We are living in an AI supercycle,” notes Nokia’s Veli-Pekka Luoma, emphasizing Finland’s shift from connecting people to connecting intelligence. This vision is backed by robust infrastructure, cutting-edge R&D, and a commitment to sustainability.

Read full announcement (external link)

Originally published on 2 Feb

Copy Link

Enersense will design and build telecommunication towers in Northern Lithuania

By Finnish-Lithuanian Chamber of Commerce 3 February 2026

Enersense has signed an agreement with Lithuania’s VŠĮ Plačiajuostis Internetas, the state-owned organisation responsible for developing Lithuania’s broadband infrastructure, for the design and construction of telecommunications towers. The towers form part of Lithuania’s nationwide programme to expand high-speed broadband infrastructure.

The towers are steel lattice communication structures that form part of Lithuania’s essential digital infrastructure.

Read full announcement (external link)

Originally published on 29 Jan

Copy Link

Cast AI Wins Prestigious European AI Award for Business Innovation

By Cast AI 2 February 2026

Cast AI, the leading Application Performance Automation platform valued at over $1 billion, today announced it has won the European AI Award 2025 in the AI Business category. The award, presented by the European AI Forum (AIEF), recognizes outstanding achievements in AI that are shaping business, science, policy, investment, and ecosystem development across Europe.

Cast AI was honored for its platform that automates AI application performance in Kubernetes environments, delivering significant cost optimization and operational efficiency. The company was one of only three winners selected in the AI Business category, chosen from nominees across the continent for their contributions to economic growth, industrial competitiveness, and societal benefits through AI.

Read full announcement (external link)

Originally published on 2 Feb

Copy Link

MILA Joins the European Commission’s “Apply AI” Stakeholders’ Catalogue

By Mila 2 February 2026

We are proud to announce that the Latvian Association of Artificial Intelligence (MILA) has officially joined the Apply AI Alliance Stakeholders’ Catalogue.

This catalogue serves as the European Commission’s “official phonebook” of trusted organizations. It is the primary resource used by the Commission to identify stakeholders for shaping AI policy, participating in sectoral workshops, and attending annual AI Office gatherings.

Read full announcement (external link)

Originally published on 2 Feb

Copy Link

Estonia, Latvia, Lithuania and Germany renew a four-party agreement in Tallinn to strengthen strategic communication and media literacy

By Estonian Ministry of Foreign Affairs 2 February 2026

Today, 29 January, the Secretary General of the Estonian Ministry of Foreign Affairs, Jonatan Vseviov, the State Secretary of the German Federal Foreign Office, Bernhard Kotsch and the Vice-Minister of Foreign Affairs of Lithuania, Vidmantas Verbickas, signed a four-party cooperation memorandum in Tallinn aimed at strengthening ties between the countries in the fields of strategic communication and media literacy. The agreement was signed ahead of the meeting also by the Latvian State Secretary Andžejs Vilumsons, with Latvia represented at the meeting by the Inspector General of the Latvian Ministry of Foreign Affairs, Ilgvars Kļava. The agreement is an updated version of the cooperation memorandum first concluded between the foreign ministries of the four countries in 2015.

Secretary General Vseviov emphasised that in the context of growing foreign influence activities, disinformation and hostile propaganda, it is crucial to strengthen societal resilience. He noted that closer cooperation between like-minded countries is key to protecting and developing the democratic information space.

Read full announcement (external link)

Originally published on 29 Jan

Copy Link