Tallinn Airport Launches Extensive Expansion of the Passenger Terminal

Tallinn Airport is embarking on the largest development project in its history, expanding the passenger terminal to accommodate future growth. By 2030, the airport expects to serve nearly 5 million passengers a year — a volume that exceeds the capacity of the current terminal. The terminal expansion is divided into five stages to allow construction in different parts of the building at different times, with works continuing until 2030.

The existing terminal was designed to serve 2.8 million passengers per year, yet today more than 3.5 million people already pass through Tallinn Airport annually. By 2030, the number is projected to reach nearly 5 million. The total estimated cost of the development project is 75 million euros, making it the largest investment in the airport’s history. The exact cost will be determined after all procurement processes have been completed. “Most of the design work has now been finalised. Construction of the first phase inside the terminal has already begun, and the next major construction tender will be announced in mid-December with estimated cost of 50 million auros,” said Riivo Tuvike, Chairman of the Management Board of Tallinn Airport.

“This expansion provides a foundation for future developments, which is why we designed the new volumes to integrate naturally with the existing terminal’s architecture,” explained architect Jaan Kuusemets from Dagopen. “The northern extension and smaller additions continue the terminal’s parapet line and will eventually be tied together with an elegant ribbon façade. The roof shape, overall massing and height are derived from the proportions of the historical terminal, reinterpreted in a contemporary architectural language to create a balanced and context-sensitive composition.”

Read full announcement (external link)

Originally published on 3 Dec

Announcements are published as a service to readers. The sender is responsible for all content. Announcements for publication can be submitted to announcements@thehanseatic.com.

Copy Link

Enefit to Triple Its Battery Storage Capacity

By Enefit 19 March 2026

Enefit, the electricity business of Eesti Energia, is expanding its energy storage portfolio by building three new battery storage systems next to its wind farms in Lithuania. The new systems will have a combined capacity of 46 megawatts (MW) and 184 megawatt-hours (MWh). Once completed, Enefit’s storage portfolio will grow from the current 29 MW to 75 MW, strengthening the company’s position in the Baltic energy storage market.

“Energy storage is a key component of the modern energy system. Battery solutions help balance wind and solar generation, support grid stability, and mitigate high price peaks,” said Donatas Celešius, Member of the Management Board of Enefit and Head of Business Development. “Storage solutions also increase the value of our existing production assets and strengthen our integrated generation portfolio as a whole.”

Read full announcement (external link)

Originally published on 19 Mar

Copy Link

Estonia Increases Film Estonia cash rebate programme to 40%

By Film Estonia 18 March 2026

Great news for our international partners. Estonia will increase the Film Estonia cash rebate from 30% to 40%, strengthening the country’s competitiveness in the international film production market. “It’s official. Minister Heidy Purga has confirmed the final step of a long process: Film Estonia moves forward with a 40% cash rebate for film and TV production.

Regulations still need to be updated — and then, let’s roll!” stated Edith Sepp, head of the Estonian Film Institute.

Read full announcement (external link)

Originally published on 9 Mar

Copy Link

Sunly signs PPA agreement for 60 MW solar park in Poland

By Sunly 18 March 2026

Sunly has signed a power purchase agreement (PPA) with Respect Energy for the Rzezawa solar park in southern Poland. The agreement covers the sale of 100% of the electricity generated by the 60 MW photovoltaic installation.

The contract has been concluded in a “pay as potentially produced” structure. In addition to the electricity offtake, the cooperation includes providing balancing services with the installation. Respect Energy will act as the Balancing Services Provider (BSP), enabling the solar park to participate in the balancing market once the formal qualification process and technical integration are completed.

Read full announcement (external link)

Originally published on 18 Mar

Copy Link

Sweden: EIB launches first pre-IPO support to help European growth company access public markets

By European Investment Bank 18 March 2026

The European Investment Bank (EIB) has signed its first pre-IPO advisory agreement to help a European growth company prepare for access to public capital markets. The support is provided through the InvestEU Advisory Hub and aims to strengthen the ability of innovative European companies to grow and remain in Europe as they scale.

The agreement supports Swedish biotechnology company Anocca, based in Södertälje, which develops next-generation T-cell immunotherapies for cancer. T-cell immunotherapy is a form of treatment that uses a patient’s own immune cells, engineered to recognise and attack cancer cells more effectively.

Read full announcement (external link)

Originally published on 18 Mar

Copy Link

Another new innovative and military technology company in the Port of Riga

By Port of Riga 18 March 2026

Ship design and construction company “Latitude Construction”, working under the Latitude Yachts brand in the Port of Riga, will establish a new company “Latitude Naval Technologies” with the aim to develop modern offshore platforms for security and defense operations.

Thus, another company will join the innovative and military technology production facilities of the Port of Riga, developing a new direction in the Latvian shipbuilding industry, combining extensive experience in shipbuilding with the growing demand for modern maritime safety technologies. In the current conditions, such a production facility will not only contribute to the economic growth of Latvia but also boost the security of Latvia and its partners.

Read full announcement (external link)

Originally published on 18 Mar

Copy Link

Bolt partners with NVIDIA to build Europe’s autonomous vehicle foundation

By Trade with Estonia 17 March 2026

Estonia is no longer just a land of humble startups, as its premier companies are scaling ambitions. This week, Tallinn-based mobility giant Bolt announced that it will partner with NVIDIA to develop an AI-powered platform for autonomous vehicles tailored specifically to European roads.

The collaboration pairs Bolt’s vast amounts of real-world driving data — collected daily across its ride-hailing, carsharing, micromobility and delivery operations in 50+ countries and 850+ cities — with NVIDIA’s latest autonomous driving stack.

Read full announcement (external link)

Originally published on 17 Mar

Copy Link

IuteBank begins operations in Ukraine

By Iute Group 17 March 2026

Iute Group, a leading European personal finance group, begins operations with IuteBank in the Ukrainian banking market on 17 March 2026. The start of operations follows the completion of the transition process and marks an important milestone in the Group’s expansion of its digital banking model into one of Europe’s most digitally advanced financial markets. The transition process was completed earlier than initially expected. 

 With the start of operations, IuteBank will initially offer a focused set of core banking services, including current accounts, deposits, and instant payments, to its existing customer base. This initial phase is designed to ensure a stable and well-governed foundation. The build-out of Iute’s full digital product capabilities and the launch of a comprehensive value proposition, including mobile banking and active customer acquisition, is planned for early 2027. 

Read full announcement (external link)

Originally published on 16 Mar

Copy Link

Riga is set to become Europe’s audio capital – “Radiodays Europe 2026” will take place in Latvia

By Investment and Development Agency of Latvia 17 March 2026

From March 22 to 24, 2026, Riga will become the center of the European audio industry for a few days, hosting the world’s leading radio, podcast, and digital audio conference, “Radiodays Europe 2026.”

The event will bring together more than 1,500 media professionals from over 65 countries, including executives from major public and commercial media outlets, podcast creators, technology companies, content creators, and audio innovation experts. The conference in Riga will become one of the most significant international media industry events in the Baltic region.

Read full announcement (external link)

Originally published on 16 Mar

Copy Link

UXP receives GovStack recognition as a trusted Information Mediator solution

By Announcements and Cybernetica 16 March 2026

Cybernetica joins GovStack’s network of recognised companies, with Unified eXchange Platform (UXP) officially approved by GovStack as a software compliant with the Information Mediator Building Block — a foundational component of the GovStack reference architecture for digital public infrastructure (DPI).

The Information Mediator (IM) is one of the most critical building blocks in the GovStack reference architecture, serving as the central nervous system of a digital government. It enables other building blocks — such as identity, payments, and registries — to communicate in a secure and verifiable manner. Without a robust IM layer, interoperability across government systems remains fragmented and vulnerable.

Read full announcement (external link)

Originally published on 16 Mar

Copy Link

Parallel fairway in Vuosaari Harbour benefits the environment and boosts resilience

By Port of Helsinki 16 March 2026

The fairway to Vuosaari Harbour around the west side of Pikku Niinisaari will be opened to ship traffic in spring 2026. The fairway will ensure smoother traffic and make the visit to Vuosaari Harbour even more efficient. Taking the fairway into use will also benefit the environment, being part of the development of the low-emission sea route between Helsinki and Tallinn, the FIN-EST Green Corridor project.

The fairway used to serve the shipyard that operated in Vuosaari 1974–1987. The name “Shipyard fairway” dates back to these times. Minor changes were made to the fairway to expand it slightly, and some dredging work was carried out to ensure the fairway’s efficiency and safety to modern ships. The floating safety devices were upgraded to larger ones in January.

Read full announcement (external link)

Originally published on 16 Mar

Copy Link