Klaipėda port’s green course: international ferries will soon be able to switch off their engines while berthed

Port or Klaipėda continues to move along its green course. The port’s terminals have already received the new on-shore power supply systems, and installation is now underway. Testing is planned to begin later this year, and by next year ferries calling at the designated ro-ro terminals will be able to switch off their engines and draw clean electricity from shore -significantly reducing air pollution and noise. The OPS infrastructure being installed in the port is designed specifically for ro-ro vessels, with a total of four shore-power connection points to be set up for ferries.

“Klaipėda Port’s green vision is becoming reality – sustainability here is no longer just a promise. With shore-side electricity, ferries will be able to shut down their engines and reduce their environmental footprint to almost zero. And this is only the beginning. It’s more than a technological milestone – it’s our commitment to the city, its people, and a cleaner future for our sea,” says Algis Latakas, CEO of the Klaipėda State Seaport Authority.

This initiative marks a significant step in Klaipėda Port’s wider shift toward electrification. Earlier this autumn, the port installed its first on-shore power system at the Fleet Base, designed mainly to support the new hydrogen and electric-powered waste collection vessel now nearing completion. The systems now being put in place at the two terminals are specifically tailored for ferries and ro-ro vessels operating between Klaipėda and Denmark, Sweden, Germany and Poland, carrying rolling cargo. In the coming years, similar systems are planned for other terminals as well, enabling shore-side electricity for cruise ships and container vessels.

Read full announcement (external link)

Originally published on 10 Nov

Announcements are published as a service to readers. The sender is responsible for all content. Announcements for publication can be submitted to announcements@thehanseatic.com.

Copy Link

6G testing in mines: Collaboration with Oulu University

By Luleå Teknsika Universitet 14 March 2025

Luleå University of Technology is breaking new ground in mining technology by conducting innovative research into 6G networks in collaboration with Oulu University. This pioneering project aims to explore how next-generation wireless technology can enhance safety, efficiency, and communication in mining environments, laying the foundation for a transformation in the industry.

Read full announcement (external link)

Originally published on 14 Mar

Copy Link

The Swedish Maritime Administration and Ports of Stockholm establish a joint maritime traffic centre

By Ports of Stockholm 14 March 2025

The Swedish Maritime Administration and Ports of Stockholm are taking a historic step by establishing a joint maritime traffic centre in Stockholm. The co-operation will enhance the efficiency and safety of vessel traffic from Oxelösund in the south and up along the entire northern coast of Sweden. In early March, the parties signed a cooperation agreement that marks the start of a groundbreaking initiative. The traffic centres of the Swedish Maritime Administration and Ports of Stockholm will form a joint maritime traffic centre at the Värtahamnen port in Stockholm.

Read full announcement (external link)

Originally published on 14 Mar

Copy Link

NIB surpasses EUR 10 billion in total green bond issuance with new EUR 750 million Environmental Bond

By The Nordic Investment Bank 13 March 2025

On 12 March 2025, the Nordic Investment Bank (NIB) priced a new seven-year, EUR 750 million NIB Environmental Bond (NEB). This latest transaction takes NIB’s total green bond issuance past the EUR 10 billion milestone since its first NEB in 2011, solidifying the Bank’s position in the market and underscoring the robust investor confidence in its environmental mandate.

Read full announcement (external link)

Originally published on 13 Mar

Copy Link

Two international consortia declared successful in Rail Baltica’s main line construction procurement in Estonia

By Rail Baltica 13 March 2025

The construction procurement for the mainline of Rail Baltica’s Estonian section has reached a significant milestone: two international consortia have been declared successful. Upon contract signing, these consortia will implement the construction of two major sections of the international high-speed railway. This step ensures full contractual coverage of the Estonian passenger mainline, bringing Rail Baltica closer to establishing a functional rail corridor between Tallinn and Warsaw by 2030.

Read full announcement (external link)

Originally published on 13 Mar

Copy Link

Vilnius Recognised for Excellence in Foreign Direct Investment

By Lithuania Co-create 12 March 2025

Vilnius has been awarded the top international recognition for its foreign direct investment (FDI) strategy, securing the prestigious Best FDI Strategy Award at MIPIM 2025, one of the world’s largest real estate exhibitions. The Lithuanian capital was honoured in the fDi European Cities and Regions of the Future 2025 rankings for mid-sized cities, an initiative by fDi Intelligence, a division of the Financial Times. This recognition underscores Vilnius’ long-term commitment to attracting global investment, fostering a business-friendly environment, and driving innovation.

Read full announcement (external link)

Originally published on 12 Mar

Copy Link

Run for a Top Leadership Role in the Baltic Sea Region Youth Forum Elections

By Council of the Baltic Sea States 12 March 2025

If you are 16-29 and live or are from the Baltic Sea Region, you are invited to run for a top leadership position in the Baltic Sea Region Youth Forum (BSRYF), a platform enabling young individuals to shape their future. Registration for the third election cycle is now open. Young individuals and aspiring young leaders can apply until 6 April 2025, with elections taking place online on 24 April 2025.  

Read full announcement (external link)

Originally published on 12 Mar

Copy Link

Energy communities – the future of sustainable heating and electricity in Latvia

By Vidzeme Planning Region 11 March 2025

The second Green4HEAT regional working group took place in Salaspils, where representatives of local governments, experts of heat supply companies and energy specialists discussed the development of energy communities in Latvia. The event took place within the framework of the Interreg Europe programme project Green4HEAT, which aims to accelerate the deployment of low-temperature heating solutions by promoting cooperation and knowledge sharing between regions.

Read full announcement (external link)

Originally published on 11 Mar

Copy Link

The film industry needs technology and your idea could be the next big breakthrough. Apply now to the Film and Multimedia Accelerator!

By Tehnopol 11 March 2025

The Tehnopol Film and Multimedia Accelerator, which is part of the IDA Hub film campus being developed in Jõhvi, is looking for new and ambitious teams who want to drive innovation in film production and multimedia work. The news last week that the building contract for the Jõhvi film campus had been signed was very exciting for us and for our partners. The doubters who said that Ida-Virumaa could not be a base for new technology and a major platform for cinematic advances have been shown to be mistaken. Technology develops so fast that a technological approach can achieve a great deal without anyone needing to go anywhere near Hollywood.

Read full announcement (external link)

Originally published on 11 Mar

Copy Link

Latvia Ready to Adopt Norway’s Experience in Green Hydrogen Development

By Investment and Development Agency of Latvia 10 March 2025

Today, a study was presented regarding the role of green hydrogen in the Norwegian economy and its potential development in Latvia. Currently, Norway produces 10% of Europe’s total green hydrogen, making it the second-largest player in the industry after Germany. Latvia has also begun early-stage hydrogen technology applications in various sectors, including water transport and aviation fuel, which could potentially establish a new economic industry.

Read full announcement (external link)

Originally published on 10 Mar

Copy Link

Sunly to Build a €7 Million Battery Storage Unit at Raba Solar Park

By Sunly 8 March 2025

Sunly, in collaboration with Metsagrupp, is developing a 16 MW / 32 MWh battery energy storage system (BESS) next to the 45 MW Raba solar park. The total project cost is €7 million, and it will be built without subsidies. Construction is set to begin this summer, with completion expected in early 2026.

The construction permit for the Raba battery park, located in Pärnumaa, was obtained in January, and work will commence in the coming months. The 16 MW battery can store 32 MWh of electricity over two hours, ensuring that solar energy can be used even when the sun is not shining.

Read full announcement (external link)

Originally published on 7 Mar

Copy Link