“Ready for Offshore” programme to equip Polish companies seeking to enter the offshore wind sector: training, competence development and financing of up to PLN 100 million

In July of this year, electricity generated by an offshore wind farm was supplied to the Polish grid for the first time in history, through the Baltic Power project. This marks the beginning of an ambitious offshore development programme in Poland. In the near future, the Baltic Sea has the potential to become one of the most important regions for the development of new, stable and low-carbon energy sources for the economy. According to Poland’s energy policy objectives, the country plans to achieve 5.9 GW of installed offshore wind capacity by 2030, with this potential increasing to as much as 18 GW by 2040. With planned investments reaching PLN 500 billion by 2040, the sector is expected to become one of the key drivers of the energy transition and a cornerstone of Poland’s energy security.
The “Ready for Offshore” programme responds to the needs of the emerging offshore ecosystem and supply chain, including offshore wind investors, Polish companies seeking participation in contracts, and research and development institutions. The programme was designed following consultations with representatives from various industries. These consultations confirmed that Polish companies are ready to enter the offshore market but require support in developing competencies and gaining access to financing.
The initiative is built on two pillars:
Tailored Financial Instruments – ARP S.A. provides companies interested in joining offshore supply chains with a package of flexible financial products, including: investment loans, including loans backed by the InvestEU guarantee, development loans supporting projects financed through EU grants, leasing solutions. These instruments can be combined flexibly to finance investments required for the execution of offshore contracts. In addition, companies carrying out such projects within special economic zones managed by ARP may benefit from corporate income tax exemptions of up to 70% of the investment value for up to 15 years.
Competencies and Certifications – Based on recommendations developed together with PARP, Polish companies can access subsidised training programmes listed in the Development Services Database (BUR). These programmes cover eight key competencies required for participation in offshore projects, including: supply chain entry strategies, tendering and bidding processes, contracting, health and safety, quality management, delivery execution, innovation, and workforce development.
Read full announcement (external link)
Originally published on 15 Sep
Announcements are published as a service to readers. The sender is responsible for all content. Announcements for publication can be submitted to announcements@thehanseatic.com.

Luleå University of Technology is breaking new ground in mining technology by conducting innovative research into 6G networks in collaboration with Oulu University. This pioneering project aims to explore how next-generation wireless technology can enhance safety, efficiency, and communication in mining environments, laying the foundation for a transformation in the industry.
Read full announcement (external link)
Originally published on 14 Mar
The Swedish Maritime Administration and Ports of Stockholm establish a joint maritime traffic centre

The Swedish Maritime Administration and Ports of Stockholm are taking a historic step by establishing a joint maritime traffic centre in Stockholm. The co-operation will enhance the efficiency and safety of vessel traffic from Oxelösund in the south and up along the entire northern coast of Sweden. In early March, the parties signed a cooperation agreement that marks the start of a groundbreaking initiative. The traffic centres of the Swedish Maritime Administration and Ports of Stockholm will form a joint maritime traffic centre at the Värtahamnen port in Stockholm.
Read full announcement (external link)
Originally published on 14 Mar

On 12 March 2025, the Nordic Investment Bank (NIB) priced a new seven-year, EUR 750 million NIB Environmental Bond (NEB). This latest transaction takes NIB’s total green bond issuance past the EUR 10 billion milestone since its first NEB in 2011, solidifying the Bank’s position in the market and underscoring the robust investor confidence in its environmental mandate.
Read full announcement (external link)
Originally published on 13 Mar

The construction procurement for the mainline of Rail Baltica’s Estonian section has reached a significant milestone: two international consortia have been declared successful. Upon contract signing, these consortia will implement the construction of two major sections of the international high-speed railway. This step ensures full contractual coverage of the Estonian passenger mainline, bringing Rail Baltica closer to establishing a functional rail corridor between Tallinn and Warsaw by 2030.
Read full announcement (external link)
Originally published on 13 Mar

Vilnius has been awarded the top international recognition for its foreign direct investment (FDI) strategy, securing the prestigious Best FDI Strategy Award at MIPIM 2025, one of the world’s largest real estate exhibitions. The Lithuanian capital was honoured in the fDi European Cities and Regions of the Future 2025 rankings for mid-sized cities, an initiative by fDi Intelligence, a division of the Financial Times. This recognition underscores Vilnius’ long-term commitment to attracting global investment, fostering a business-friendly environment, and driving innovation.
Read full announcement (external link)
Originally published on 12 Mar

If you are 16-29 and live or are from the Baltic Sea Region, you are invited to run for a top leadership position in the Baltic Sea Region Youth Forum (BSRYF), a platform enabling young individuals to shape their future. Registration for the third election cycle is now open. Young individuals and aspiring young leaders can apply until 6 April 2025, with elections taking place online on 24 April 2025.
Read full announcement (external link)
Originally published on 12 Mar

The second Green4HEAT regional working group took place in Salaspils, where representatives of local governments, experts of heat supply companies and energy specialists discussed the development of energy communities in Latvia. The event took place within the framework of the Interreg Europe programme project Green4HEAT, which aims to accelerate the deployment of low-temperature heating solutions by promoting cooperation and knowledge sharing between regions.
Read full announcement (external link)
Originally published on 11 Mar

The Tehnopol Film and Multimedia Accelerator, which is part of the IDA Hub film campus being developed in Jõhvi, is looking for new and ambitious teams who want to drive innovation in film production and multimedia work. The news last week that the building contract for the Jõhvi film campus had been signed was very exciting for us and for our partners. The doubters who said that Ida-Virumaa could not be a base for new technology and a major platform for cinematic advances have been shown to be mistaken. Technology develops so fast that a technological approach can achieve a great deal without anyone needing to go anywhere near Hollywood.
Read full announcement (external link)
Originally published on 11 Mar

Today, a study was presented regarding the role of green hydrogen in the Norwegian economy and its potential development in Latvia. Currently, Norway produces 10% of Europe’s total green hydrogen, making it the second-largest player in the industry after Germany. Latvia has also begun early-stage hydrogen technology applications in various sectors, including water transport and aviation fuel, which could potentially establish a new economic industry.
Read full announcement (external link)
Originally published on 10 Mar

Sunly, in collaboration with Metsagrupp, is developing a 16 MW / 32 MWh battery energy storage system (BESS) next to the 45 MW Raba solar park. The total project cost is €7 million, and it will be built without subsidies. Construction is set to begin this summer, with completion expected in early 2026.
The construction permit for the Raba battery park, located in Pärnumaa, was obtained in January, and work will commence in the coming months. The 16 MW battery can store 32 MWh of electricity over two hours, ensuring that solar energy can be used even when the sun is not shining.
Read full announcement (external link)
Originally published on 7 Mar