First tunnel element prepared for immersion

Preparation of the first element for the Fehmarnbelt tunnel is well under way. The element, which is the first of a total of 89, has just been filled with 4,500 tonnes of ballast concrete. This increases the weight from 73,500 tonnes and enables the element to later sink in a controlled manner down onto the seabed.
The work inside the element has been carried out via a temporary access structure consisting of five shafts, which are bolted onto the watertight steel bulkheads that keep the water out. At one end there is a materials lift, a concrete shaft and a man‑access shaft, which also functions as ventilation. At the other end there is a ventilation shaft and an emergency shaft for personnel.
Read full announcement (external link)
Originally published on 22 Apr
Announcements are published as a service to readers. The sender is responsible for all content. Announcements for publication can be submitted to announcements@thehanseatic.com.

Estonia opened the first Business Hub in U.S. Located at the Embassy of Estonia in Washington, D.C., the Business Hub will serve as a bridge between Estonian companies and the vast business opportunities in the U.S. market. A delegation of Estonian defence industry innovators was present at the opening event, also attending the annual AUSA conference.
Read full announcement (external link)
Originally published on 17 Oct