New industrial development area and railway infrastructure available for investment in Valmiera – Valmiera Industrial Park is completed

Construction has been completed at Valmiera Industrial Park, which is an infrastructure of national importance – a railway siding and internal railway, a cargo loading/unloading (logistics) site, and an industrial electricity connection have been put into operation. The rest of the infrastructure intended for exporting manufacturing companies operating in smart specialization (RIS3) sectors, creating products with high added value, has also been completed. The newly built railway infrastructure will strengthen the role of Valmiera region in the European transport network, consolidating its position as an important connection point between regions and the Baltic States.
Valmiera Industrial Park, operating as Latvia’s first domestic multimodal logistics center, will promote economic growth and export capacity in Vidzeme. This will be a significant stage of development and change in the transport and storage sector, as companies in Vidzeme and South Estonia will be able to optimize their supply chains while reducing transport costs and emissions, as well as the load on roads. The potential of the new and competitive railway infrastructure and the extensive concrete logistics area has also been dubbed Latvia’s first “dry port” (i.e., inland intermodal terminals directly connected to seaports by road or rail).
“Targeted investment in business development is always necessary to promote growth and maintain competitiveness. The development of the Valmiera Industrial Park has been purposefully planned since 2014, implementing this idea gradually and thoughtfully to ensure maximum return on invested resources in the long term. It is planned that at least three export-oriented companies will start operating in the area to be developed under the project, creating new jobs and making significant investments in business. These are historically the largest investments in the development of the Valmiera region, which will make a significant contribution to both the region’s economy and the well-being of its residents. At the same time, in parallel with the development of business infrastructure in the municipality, we continue to invest in affordable housing and competitive education to ensure a timely supply of qualified specialists to the labor market,” says Jānis Baiks, Chairman of the Valmiera Municipality Council.
Read full announcement (external link)
Originally published on 17 Dec
Announcements are published as a service to readers. The sender is responsible for all content. Announcements for publication can be submitted to announcements@thehanseatic.com.

The second Green4HEAT regional working group took place in Salaspils, where representatives of local governments, experts of heat supply companies and energy specialists discussed the development of energy communities in Latvia. The event took place within the framework of the Interreg Europe programme project Green4HEAT, which aims to accelerate the deployment of low-temperature heating solutions by promoting cooperation and knowledge sharing between regions.
Read full announcement (external link)
Originally published on 11 Mar

The Tehnopol Film and Multimedia Accelerator, which is part of the IDA Hub film campus being developed in Jõhvi, is looking for new and ambitious teams who want to drive innovation in film production and multimedia work. The news last week that the building contract for the Jõhvi film campus had been signed was very exciting for us and for our partners. The doubters who said that Ida-Virumaa could not be a base for new technology and a major platform for cinematic advances have been shown to be mistaken. Technology develops so fast that a technological approach can achieve a great deal without anyone needing to go anywhere near Hollywood.
Read full announcement (external link)
Originally published on 11 Mar

Today, a study was presented regarding the role of green hydrogen in the Norwegian economy and its potential development in Latvia. Currently, Norway produces 10% of Europe’s total green hydrogen, making it the second-largest player in the industry after Germany. Latvia has also begun early-stage hydrogen technology applications in various sectors, including water transport and aviation fuel, which could potentially establish a new economic industry.
Read full announcement (external link)
Originally published on 10 Mar

Sunly, in collaboration with Metsagrupp, is developing a 16 MW / 32 MWh battery energy storage system (BESS) next to the 45 MW Raba solar park. The total project cost is €7 million, and it will be built without subsidies. Construction is set to begin this summer, with completion expected in early 2026.
The construction permit for the Raba battery park, located in Pärnumaa, was obtained in January, and work will commence in the coming months. The 16 MW battery can store 32 MWh of electricity over two hours, ensuring that solar energy can be used even when the sun is not shining.
Read full announcement (external link)
Originally published on 7 Mar

On 12 March 2025, maritime experts from CBSS Member States will convene online to discuss the priorities and initiatives of the Estonian CBSS Presidency on Green Shipping Corridors and Digital Twins of the Baltic Sea. The meeting is part of ongoing efforts to map current activities on these topics at both national and macro-regional levels in the Baltic Sea Region.
Read full announcement (external link)
Originally published on 6 Mar

Lithuania continues to bolster its presence in the international tourism scene, having recently received the prestigious ITB Health Tourism Award 2025. This award, presented by the world’s largest tourism exhibition, ITB Berlin, recognises countries for their achievements in developing health tourism infrastructure, service quality, and international visibility.
Read full announcement (external link)
Originally published on 7 Mar

NIB, Luminor Bank and NORD/LB have agreed to co-finance a 148 MWp solar farm in the Ventspils municipality. The project is developed by Stelo Orienta SIA, a subsidiary of European Energy, a Danish renewable energy company.
The overall financing amounts to EUR 68 million. NIB’s EUR 28 million loan is supported by the European Union under NIB’s InvestEU Framework Operation on Clean Energy Transition. This is NIB’s first InvestEU loan in Latvia.
Read full announcement (external link)
Originally published on 6 Mar

Akciju Sabiedriba ELKO Grupa (ELKO Group), a region’s leading distributor of IT and consumer electronics products, through its subsidiary Gandalf Distribution AB, has concluded a sales and purchase agreement for the purchase of 78.95 percent of the shares in Renewed AB, a fast-growing Sweden-based electronics recommerce player.
Read full announcement (external link)
Originally published on 6 Mar

INVL Baltic Sea Growth Fund, the leading private equity fund in the Baltics, together with the other shareholders, have completed the sale of InMedica Group, Lithuania’s largest private healthcare network, to Mehiläinen, Finnish largest social and healthcare provider with fast growing international presence
Read full announcement (external link)
Originally published on 6 Mar

Stable supply of electricity at affordable prices, achieving full independence of the Baltic Sea region from Russian supplies, as well as clean air, thanks to joint projects for the development of new technologies, including hydrogen, are potential benefits of cooperation between the Baltic countries, according to a new report by the ORLEN Group and S&P Agency. The report assesses the progress of the energy transition in the region and identifies opportunities for collaboration to accelerate decarbonisation efforts. It outlines specific areas of cooperation and their expected outcomes, following an in-depth analysis of conditions across eight countries: Poland, Germany, Denmark, Sweden, Finland, Lithuania, Latvia, and Estonia.
Read full announcement (external link)
Originally published on 4 Mar